Termites lead to
essentially the most severe harm when compared with other wood-feeding insects.
They attack timber and wood items as well as growing trees, leather, wool and
agricultural crops. Man-made components for example polythene, plastics, some
metal foils, too as books, furniture, wooden electric/ phone poles and railway
sleepers, are equally severely attacked by termites.
Effects of those
damages are huge and call for any systematic manage of these termites.
Termite Manage
around the Farm
TERMTE Control
IN BUILDINGS
Inside the
tropics exactly where termite attack on buildings are rampant, foundation
trenches dug on building sites are sprayed with two measures (56.8ml.) of
aldrin or dieldrin or dieldrex 20 mixed with 4.five litres of water. This is
sprayed in each and every 60cm of trench, which need to be back-filled and
sprayed once more. The remedy can protect buildings against termite attack for
several years.
For erected
buildings, it truly is recommended that four.5 litres in the above dilution of
aldrin or dieldrin must be sprayed into a narrow trench dug around the outdoors
of the constructing, utilizing four.five litres from the chemical to each 60cm
of trench. The trench must be back-filled and sprayed once again. The trench
need to not be produced deeper than the base of the foundation wall. Floors may
also be lifted and sprayed employing this recommended dosage to each and every
0.5 sq.m. Alternatively, holes may be made onto floors and walls of buildings
(where hollow blocks are utilized), and application of diluted dieldrin created
through the holes. Planks and also other wood materials need to be treated with
diluted dieldrin before use to shield them against termite attack.(Dimethyl Carbonate supplier)
The soil also
can be treated prior to laying in the constructing foundation, with 16.2 to
32.five litres per 9.0 sq.m. of 5% Pentachlorophenol (PCP) in fuel oil or water
emulsion. Alternatively, the soil might be treated with 45.5 litres per 9 sq.m.
of 3% dieldrin. When mixing concrete, it's suggested that a 0.5% emulsion of
dieldrin (1.14kg of dieldrex 20 in 45.five litres of water) be employed because
the mixing water. It's also recommended that the constructing sites be leveled
and treated prior to casting of slab floors. The under listed chemicals
preparations are powerful and may possibly be applied in the following rates: Copper
Naphthanate (5% in fuel oil at 2-4 litres/sq.m.), Sodium Pentachlorophenate
(2.5% in water at 6-10 litres/sq.m.), Benzene hexachloride (0.8% in fuel oil or
emulsion in water at 6-10 litres/sq.m.).(Benzoic Acid
supplier)